I've had to put a hold on the Vario for a few more months.
A combination of being busy and tearing my Achilles hasn't helped.
Plus plans to move to a much better location in January that will have space to work on two 9m vans inside at once, plus secure parking for several more, plus it's all off-grid, plus there will hopefully be a CL on the site next year. Bit of a dream location for us, but a lot of work.
Lastly, the Vario needs a little work doing that I can't do. I have a mate that can, but he's busy and can't fit in a "mates rate" job until next month.
I want the Vario to be as good as it can be, which is a lot of work. Will be nice working inside building it over the winter
A combination of being busy and tearing my Achilles hasn't helped.
Plus plans to move to a much better location in January that will have space to work on two 9m vans inside at once, plus secure parking for several more, plus it's all off-grid, plus there will hopefully be a CL on the site next year. Bit of a dream location for us, but a lot of work.
Lastly, the Vario needs a little work doing that I can't do. I have a mate that can, but he's busy and can't fit in a "mates rate" job until next month.
I want the Vario to be as good as it can be, which is a lot of work. Will be nice working inside building it over the winter