Jim
Ringleader
Been pegging out the pitches for our CFL, its looking good, its hard to visualise as there is going to be a fair bit of scalloping and terracing. Whislt banging pegs I found a wet patch and water does not normally sit on our hill so figured it was the pipe work from our spring leaking as the pressure has been a bit down on normal. What a job, the holes fill as fast as you can dig, me and young James have managed a temporary repair, but we'll need to get muddy again tomorrow when we can effect a proper repair that does not use rags and gaffer tape