- May 7, 2013
- 852
- 1,372
- Funster No
- 25,884
- MH
- C Class
- Exp
- On our 2nd MH now a AutoTrail Savannah which we're absolutely delighted with
Hi -planning to install two 120 watt solar panels, a 20 A MPPT controller, a 350 W inverter connected to two 110 ah batteries.
The batteries will be within 1 metre of controller and the inverter.
Can you please advise the optimum cable sizes from controller to battery and battery to inverter and also the inline fuse/s size required?
Thank you again
Ian
The batteries will be within 1 metre of controller and the inverter.
Can you please advise the optimum cable sizes from controller to battery and battery to inverter and also the inline fuse/s size required?
Thank you again
Ian