    22/2/08
    A new, improved, traffic flow system is UNDER CONSTRUCTION and is causing problems in and around scarborough.

    at the moment there are roadworks on the........................

    A64(YORK RD) at STAXTON (7mls west of town)major junction work at staxton hill/A64 jtn. MAJOR DELAYS.

    A64 at the new park and ride at the BORO BOUNDRY(2mls from town center) for 26weeks. part time single lane and lights (MAJOR DELAYS)

    A165(BRIDLINGTON RD) at CAYTON BAY park and ride (4mls south of town)

    A165 at OSGODBY (3MLS SOUTH OF TOWN)single lane and lights

    A165 at VARIOUS PLACES in the town. temp lights

    long delays at PEAK times and some delays at other times.
     
  2. traveller

    traveller Read Only Funster

    Joined:
    Oct 27, 2007
    Messages:
    51
    Likes Received:
    0


    Oh b***** gonna get caught up in that as well. Any idea when it finishes



    Traveller
     
  3. pappajohn

    pappajohn Funster Life Member

    Joined:
    Aug 26, 2007
    Messages:
    29,478
    Likes Received:
    16,963
    Location:
    YO11 2BD
    the new park + ride scheme is due completion in the autumn but i doubt it will come in on time. nothing ever does in scarborough.
    i would think the roadworks will be in place for some time but its anyones guess how long.
    if you approach from whitby A171 its ok or if from york then at malton head for pickering A169 and come to scarborough on the A170. both these routes are usually pretty clear.
     
  4. pappajohn

    pappajohn Funster Life Member

    Joined:
    Aug 26, 2007
    Messages:
    29,478
    Likes Received:
    16,963
    Location:
    YO11 2BD
    i dont undestand our local council.
    passed the new p+r site today and among all the diggers,earth graders ect was a gang of blokes building the bloody bus shelters.
    they havnt even leveled the site yet let alone started the substructure of the carpark area.
    what happened to the clerk of works and his schedule of work ??????
    im sure we have idiots for councillors and they just awarded themselves an 8% rise in allowances(maybe not so stupid after all)
     
  5. zulurita

    zulurita Funster

    Joined:
    Dec 29, 2007
    Messages:
    195
    Likes Received:
    86
    Location:
    Somerset
    What will it be like by August?

    We are attending some rallies in that area in August. Thanks for the info.
     
  6. pappajohn

    pappajohn Funster Life Member

    Joined:
    Aug 26, 2007
    Messages:
    29,478
    Likes Received:
    16,963
    Location:
    YO11 2BD
    hi rita,
    the works on the A64 should be nearing an end by august but the town is a nightmare at that time anyway.
    the last 3miles or so is the worst for delays. too much traffic trying to get into the bottleneck that is scarborough.
    i think the A165 should be easier unless they are building the new roundabouts at that time.

    i'll try to keep the thread updated.

    john.
     
  7. pappajohn

    pappajohn Funster Life Member

    Joined:
    Aug 26, 2007
    Messages:
    29,478
    Likes Received:
    16,963
    Location:
    YO11 2BD
    Updated 20/3/08

    It would appear the A165 is now almost clear of works from osgodby into town.

    the A64 still has some works in progress but at least its two way trafic at the moment.

    the A64 staxton works are now completed.

    john
     