Biard 100w panel installation

Discussion in 'Solar Power' started by yorkist, Jan 31, 2016.

  1. yorkist

    yorkist Read Only Funster

    Joined:
    Jan 10, 2011
    Messages:
    64
    Likes Received:
    35
    Location:
    Altea-Benidorm
    Hiya all. Just about to instal the panel using various bits I researched and bought in UK recently. I've studied a few videos on YouTube and think I understand the process but one question. On one video the installer seems to run the cable through a fuse after the controller enroute to leisure battery? Surely that's the point of the regulator? Is a fuse essential?
     
  2. Wickolad

    Wickolad Funster

    Joined:
    Sep 10, 2013
    Messages:
    479
    Likes Received:
    517
    Location:
    Wickersley
    Yes you need to put in an inline fuse, I fitted a two way fuse board just under the regulator and put the input from panels to regulator through one and output from regulator to battery through the other. Also have regulator as close to battery as possible to reduce volt drop. Have a look at the very helpful and detailed installation instructions Techno100 put up on this forum.
     
  3. eddievanbitz

    eddievanbitz Trader - Funster

    Joined:
    Oct 4, 2007
    Messages:
    3,560
    Likes Received:
    11,121
    Location:
    Taunton Somerset
    Yes both ends, essential

    Decent regulators have a fuse built in to make the installation neater
     
Loading...

Share This Page