- Jan 24, 2010
- 2,440
- 4,850
- Funster No
- 10,065
- MH
- Adria Twin
- Exp
- Since 2007
Im going to be fitting a Sterling B2B charger, and to do so i need to do some rejigging of where things are
Currently the batteries are under the bed at the back, and they will be moving forward under a bench seat so the B2B, starter and leisure batteries are all close together - as im led to believe this works best with a B2B
but i now need a run from the leisure batteries to the back where the 12v distribution is. I can do a run under the van through existing 'holes' and have enough 35mm cable to do that (its a 4.5m run)
before i set too work - is there any reason why running the 12v under the van is not a good idea i.e. should i go 'through', or is the run too long etc
Currently the batteries are under the bed at the back, and they will be moving forward under a bench seat so the B2B, starter and leisure batteries are all close together - as im led to believe this works best with a B2B
but i now need a run from the leisure batteries to the back where the 12v distribution is. I can do a run under the van through existing 'holes' and have enough 35mm cable to do that (its a 4.5m run)
before i set too work - is there any reason why running the 12v under the van is not a good idea i.e. should i go 'through', or is the run too long etc