At last we've found a little time between hospital trips to start some work. Siân is busy upstairs decorating bedrooms, I'm outside building our 5 pitch campsite and French draining the rally field.
We've not commissioned the big stuff yet as getting tradesmen just to answer the phone or return a call is almost impossible. We need a complete rewire. a completely new boiler and central heating system, two bathrooms and a kitchen to fit after knocking various walls down. dreading it