Douglas
Free Member
I Have, for my sins, a Swift 630g that needs a new habitation door. I am sure that some of you will know the story so far.
Well I just checked with my workshop as to how things are going, (The parts have been on order since some time in May).
IE have the parts arrived yet. They told me that they were expecting that some of the parts, but not the door itself may be arriving tomorrow!
I reminded them that if the parts do not arrive by the end of September it would be too late as we will be away for the winter.
I just wondered if Swift would like to come on and tell me if I will get the door before September?
Living in hope
Doug...
Well I just checked with my workshop as to how things are going, (The parts have been on order since some time in May).
IE have the parts arrived yet. They told me that they were expecting that some of the parts, but not the door itself may be arriving tomorrow!
I reminded them that if the parts do not arrive by the end of September it would be too late as we will be away for the winter.
I just wondered if Swift would like to come on and tell me if I will get the door before September?
Living in hope
Doug...