pappajohn
LIFE MEMBER
22/2/08
A new, improved, traffic flow system is UNDER CONSTRUCTION and is causing problems in and around scarborough.
at the moment there are roadworks on the........................
A64(YORK RD) at STAXTON (7mls west of town)major junction work at staxton hill/A64 jtn. MAJOR DELAYS.
A64 at the new park and ride at the BORO BOUNDRY(2mls from town center) for 26weeks. part time single lane and lights (MAJOR DELAYS)
A165(BRIDLINGTON RD) at CAYTON BAY park and ride (4mls south of town)
A165 at OSGODBY (3MLS SOUTH OF TOWN)single lane and lights
A165 at VARIOUS PLACES in the town. temp lights
long delays at PEAK times and some delays at other times.
A new, improved, traffic flow system is UNDER CONSTRUCTION and is causing problems in and around scarborough.
at the moment there are roadworks on the........................
A64(YORK RD) at STAXTON (7mls west of town)major junction work at staxton hill/A64 jtn. MAJOR DELAYS.
A64 at the new park and ride at the BORO BOUNDRY(2mls from town center) for 26weeks. part time single lane and lights (MAJOR DELAYS)
A165(BRIDLINGTON RD) at CAYTON BAY park and ride (4mls south of town)
A165 at OSGODBY (3MLS SOUTH OF TOWN)single lane and lights
A165 at VARIOUS PLACES in the town. temp lights
long delays at PEAK times and some delays at other times.