QE2 Bridge closures 11th & 12th March (1 Viewer)

wingman

Free Member
Feb 10, 2013
1,217
3,333
Romford, Essex
Funster No
24,645
MH
Coachbuilt Lo-Profile
Exp
Since 2012
The QE2 Bridge (part of the M25 Dartford River Crossing) will be closed tonight (Friday 11th March) between 23.00hrs and 06.00hrs. It will also be closed on Saturday (12th March) between 22.00 Saturday and 06.00hrs on Sunday morning.

Traffic will cross utilising the tunnels and traffic is expected to be delayed whilst a contra-flow system is put into operation.

Funsters on their way to the channel ports (or trying to avoid paying the toll at those hours :D) shouldn't have too many problems.

Just a heads-up
James
 

GWAYGWAY

Free Member
Sep 6, 2014
4,213
3,306
Dover
Funster No
33,216
MH
Hymer ML I 580
Exp
4 years
LEZ have taken on a load of staff to deal with the penalty charges when people do not go around the other way?????????????
I bet they have not made any allowance to use the Blackwall tunnel instead of the south side route.
Watch out you Euro3 types over 3500kgs.
 

Join us or log in to post a reply.

To join in you must be a member of MotorhomeFun

Join MotorhomeFun

Join us, it quick and easy!

Log in

Already a member? Log in here.

Latest journal entries

Funsters who are viewing this thread

Back
Top