wingman
Free Member
The QE2 Bridge (part of the M25 Dartford River Crossing) will be closed tonight (Friday 11th March) between 23.00hrs and 06.00hrs. It will also be closed on Saturday (12th March) between 22.00 Saturday and 06.00hrs on Sunday morning.
Traffic will cross utilising the tunnels and traffic is expected to be delayed whilst a contra-flow system is put into operation.
Funsters on their way to the channel ports (or trying to avoid paying the toll at those hours ) shouldn't have too many problems.
Just a heads-up
James
Traffic will cross utilising the tunnels and traffic is expected to be delayed whilst a contra-flow system is put into operation.
Funsters on their way to the channel ports (or trying to avoid paying the toll at those hours ) shouldn't have too many problems.
Just a heads-up
James