Dartford Crossing Update

Discussion in 'Motorhome Chat' started by GeriatricWanderer, Jul 16, 2015.

  1. GeriatricWanderer

    GeriatricWanderer Funster

    Joined:
    Feb 1, 2015
    Messages:
    982
    Likes Received:
    3,702
    Location:
    Port Elizabeth, South Africa
    The latest from Highways England:
    Progress
    The final northbound road layout on the approach to the Dartford tunnels (A282 northbound) is now in operation. The lanes divide at junction 1a. Vehicles in lanes 1 and 2 (left hand lanes) can only use the west tunnel while vehicles in lanes 3 and 4 (right hand lanes) can only use the east tunnel. Vehicles joining at junction 1a can only access lanes 1 and 2 and use the west tunnel, which has a height restriction of 4.8m. For more information on lane and tunnel restrictions, please read section ‘Goods vehicles’ below.

    All of the old payment booths and plaza have been removed now and a new traffic safety system is in operation, which allows us to:

    • identify vehicles that may pose a safety risk, for example because they are oversized or carrying dangerous loads
    • safely escort such vehicles through the tunnel – or turn them around
    • stop vehicles entering the tunnels in the event of an incident
    We previously performed these tasks when vehicles stopped at the payment booths.

    We are now working to introduce the final southbound road layout, for traffic coming off the QEII Bridge. This includes the construction of a new retaining wall to support the new road alignment, ground strengthening and carriageway resurfacing and is expected to be complete by late July 2015.




    More info:

    http://www.highways.gov.uk/roads/road-projects/dartford-crossing-remote-payment-scheme/
     
    • Like Like x 2
  2. wingman

    wingman Funster

    Joined:
    Feb 10, 2013
    Messages:
    1,007
    Likes Received:
    2,548
    Location:
    Romford, Essex
    That explains why two lanes were closed last Saturday for the work and I got caught in a traffic jam at midnight!
    At least the end of the works is in sight now.
     
  3. Larby

    Larby Funster

    Joined:
    Jun 17, 2012
    Messages:
    1,718
    Likes Received:
    3,993
    Location:
    North Essex
    Am I right in thinking that lorries are being encouraged to use the outside lanes, that is, 3 and 4?
    That seems to go against what is normally acceptable.
     
  4. GWAYGWAY

    GWAYGWAY Funster

    Joined:
    Sep 6, 2014
    Messages:
    2,072
    Likes Received:
    1,468
    Location:
    Dover
    The newer tunnel is a fair bit higher than the original left one.
     
  5. hilldweller

    hilldweller Funster Life Member

    Joined:
    Dec 5, 2008
    Messages:
    27,268
    Likes Received:
    26,267
    Location:
    Macclesfield
    What a job. It will take a good while to recover those costs.

    Now there are no booths I wonder if they'll realise they could start charging motorcycles :(
     
  6. Jaws

    Jaws Funster Life Member

    Joined:
    Sep 26, 2008
    Messages:
    18,613
    Likes Received:
    22,769
    Location:
    Narrfoook
    For goodness sake Brian !!!!!
    SHHHHHHHHHHHHHHH !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
     
  7. TheCaller

    TheCaller Funster

    Joined:
    Sep 23, 2013
    Messages:
    1,932
    Likes Received:
    2,296
    Location:
    Lincs
    Depends.
    Do the cameras look at your front side or your backside? :)
     
  8. nobby &noo

    nobby &noo Funster

    Joined:
    Jun 12, 2015
    Messages:
    98
    Likes Received:
    119
    Location:
    kent
    they are making enough out of false fines £250,000 till now.I had 3 charges on my account for the same trip and a couple of others that were duplicates its all a big mess
     